Breakout 4 · Day 2 · two blocks
Workshopping RDM Priorities
New room, new people. Numbers do not change: your table will have numbers scattered across 1 to 26 rather than a tidy run. That is expected.
Part 1 · 11:10 to 12:30 · Part 2 · 1:30 to 2:50
Q3 worksheets on the table. Press R twice to reset the timer after lunch.
You found out which priority is yours at the 8:45 briefing this morning; the compile happened last night after you left. Ownership is unit level, never individual, all the way through.
Press T now and read the six tags and three tiers once before anyone sits down. T works from any slide, all session.
Press D now and read the instructions for keeping the discussion moving. D works from any slide. all session.
Press → when the session starts. The clock starts itself.
Part 1 · Opening
Set it up0 → 2
“Yesterday this room generated and prioritized a lot. Overnight the organizers pulled four priorities that came up across more than one table. Your group has one of them.Over the next two blocks you’re going to turn it into something real: who’d own this at an institution, what it would take, and what the first step looks like. This isn’t a polished pitch. It’s a working draft somebody could pick up and use.”
Part 1
Introductions2 → 16
“Let’s go around. Your name, your unit, and what drew you to this particular priority. I’ll start.”
- Format
- Go-around · aim for ~90 seconds each
- You first
- 30 seconds. Yours sets the length everyone copies. Watch speakers two and three.
- The point
- The second half of the ask. It sets up Q1 directly.
Two minutes each at seven people is the whole slot. At ninety seconds the round lands early; give the spare minutes straight to Q1.
Part 1 · Q1
The problem16 → 36
“What specific problem is this priority actually solving?”
- Format
- Open floor
- Do not move on
- Until the group has one shared, specific answer
- Check it
- “So the problem is X. Is that everyone’s version?”
A priority that sounded obvious in the synthesis means different things to different people. Six people quietly picturing six problems produces an unusable plan.
If it stalls
Q1 · The problem
- “Describe the last time this bit you.”
If you are still apart at the 20-minute mark: pick the narrowest version anyone offered, say “let’s build for this one and see if it generalizes,” and move.
Part 1 · Q2
Who benefits36 → 48
“Who benefits from this? Who are the users?That’s not the same as who does the work.”
- Format
- Open floor
- If they name units
- “Who’s better off because this exists?”
Narrower question than Q1. It does not need longer.
Part 1 · Q3 · one of three
Sketch your own place48 → 53
“Five minutes on your own. On the worksheet, for your institution: who would kick this off? Who would have to say yes? Who would actually do the work? And who keeps it running once it exists?Units, not names. If you don’t know, write ‘not sure’ and move on. That’s a real answer.”
- Format
- Silent, individual, on the worksheet
Say the “not sure is fine” line and mean it. Plenty of people do not know how their own research office handles approvals, and nobody wants to admit it first.
Part 1 · Q3 · two of three
Compare, one step at a time53 → 65
Take the four steps in order: “Who kicks it off? Let’s hear a few.”Then: who approves it · who does the work · who keeps it running.
- Format
- Structured by step, not by person
- Per step
- ~3 minutes. Two or three answers each, not everyone’s.
- Say aloud
- “So at some places the library starts this, at others it’s the research office”
You are listening for the range, not collecting every answer. The variation is the thing worth capturing.
If it stalls
Q3 · Compare
- “Anyone whose place does this completely differently?”
If one step turns out to be where all the disagreement lives, spend the time there and take the others fast.
Part 1 · Q3 · three of three
The portable version65 → 74
“So if someone took this back to their own institution on Monday, what would we tell them? Who leads, who has to be involved, and in what order.Where it varies, let’s say so rather than pretend there’s one answer.”
- This is the bit
- That goes in the plan
- Push for
- A lead unit and a sequence
- Say aloud
- “So that’s ___ and ___”
“The library leads this where there’s an RDM position, the research office where there isn’t” is a better answer than picking one and hoping.
Part 1 · Close
Set up lunch74 → 76
Read the plan back as it stands, off the notetaker’s screen. Under a minute.Then: “Over lunch, have a think about what already exists that we could build on. Tools, services, roadmaps, anything national or local. That’s where we start at half one.”
Part 2 · after lunch
Resume0 → 5
Read the plan back again, briefly, so the group picks up rather than re-litigating the morning. Then go straight into Q4.
- Timer
- Press R twice now to reset the clock for Part 2
- Your job
- Momentum, not thoroughness
This group has had a very long day and a half.
Part 2 · Q4
Existing resources5 → 17
“What already exists that this could build on? Tools, roadmaps, services, anything.”
- Format
- Open floor
- Push for
- Specifics over categories
- Start with
- Whatever people came back from lunch with
This room has a lot of collective knowledge about what exists nationally and locally. That is exactly what this question is for.
Part 2 · Q5
Getting started17 → 33
“What are one or two next steps that would actually get this moving?”
- Keep it to
- One or two steps. Not a project plan.
- The point
- A realistic on-ramp. People should leave able to do the first thing.
Part 2 · Q6
Roadblocks and mitigation33 → 57
“In your threes: what’s realistically going to get in the way of this, and for each one, what’s a realistic way round it?Write them in pairs on the sheet: obstacle and answer.”
- Format
- 8 min in triads · then 16 min at the table
- Be honest
- Not optimistic. A roadblock waved away is no use to anyone.
- Push past
- “We’d need buy-in” → who asks, who decides, what they need to see
The most valuable question in the session. It has 24 minutes. Use them.
If it stalls
Q6 · Roadblocks
- “What would make someone say no to this?”
Part 2 · Q7
What success looks like57 → 71
“Given everything we’ve just mapped, what would success actually look like?Something concrete. Something you could check a year from now.”
- Push past
- “More collaboration” → something countable
This comes last on purpose, so it is grounded in the resources, steps and roadblocks they just named, not an ideal from before they knew what was realistic.
Part 2 · Wrap
Close it out71 → 77
Read the completed plan back in full, start to finish. Name it as an accomplishment first: this group built a plan in a day and a half, with people they had never worked with.
- Then check
- Problem · benefits · implements · resources · next steps · roadblocks · mitigation · success
- Later
- Your two-minute share at 3:10 comes straight off this read-back
Priority name and first step, drink in hand. Nothing formal, no slides. If you would rather not, say so and Sandra or Nick will read it for you.